Essar Power (India)

  • Bhander Power-Hazira (500 MW 3x Frame 9001E gas turbines). The Bhander Power-Hazira plant is a natural gas-fired combined-cycle captive power plant. The plant was commissioned in 2006 and commenced full commercial operations in October 2008
     

Rural Power Company Limited (Bangladesh)

  • Mymensingh Power Station Bangladesh (210MW 4x Frame 6 B, steam cycle 1 x 70 MW) combined cycle power plant

 

Rovinari (Romania)

  • TPP-4 units 330 MW with boilers 1080 t/h coal-fired including auxiliaries

 

Turceni (Romania)

  • TPP-6 units 330 MW with boilers 1080 t/h coal-fired including auxiliaries

 

Gesira power plant Mogadishu (Somalia)

  • 15 MW BBC steam turbine, heavy fuel-fired boiler and balance of plant

 

Varadero (Cuba)

  • 1 x 85 MW ABB ATP4 V80 steam turbine
  • 3 x 35 MW GE 6551B gas turbines
  • Balance of plant

 

Novomoskovskaya (Russia)

  • 1 x 125 MW 9001 E gas turbine
  • 1 x 65 MW steam turbine
  • Balance of plant

 

Erbil (Irak)

  • 8 x 125 MW 9001 E gas turbines
  • Balance of plant

 

Severo-Zapadnay (Russia)

  • Two 450-MW, 2+1 CCGT blocks with V94,2 gas turbines
  • Balance of plant

 

Deir-Ammar (Lebanon)

  • 435-MW, 2+1 CCGT with V94.2 gas turbines
  • Balance of plant

 

Nainawa (Irak)

  • 6 x 125 MW 9001 E gas turbines
  • Balance of plant

 

Sylhet (Bangladesh)

  • 1 x 150 MW AE 94.2 gas turbine
  • Balance of plant

 

 

Inspection of 1 x 47MW Gas turbine Compressor

Inspection of 1 x 47MW gas turbine compressor

 

2700MW Power Plant in Frimmersdorf Germany

 2700MW coal-fired power plant in Germany

 

Waste incineration plant municipality of Rosenheim

Modern control room of a waste incineration plant